About Ardmore St Bridge

Project Brays Segment 2 Map

Ardmore

What is being done to the Ardmore St Bridge?

The current bridge will be demolished and replaced with a higher, longer, and wider bridge. The new bridge will include a through lane in each direction, a left turn lane, a U-turn lane, and an expanded 10-foot sidewalk. Sections of North and South MacGregor will be replaced to match the new bridge elevation, and intersections will be re-built with additional traffic lights. Storm sewer inlets, street striping, and sidewalks will also be added.

Project ID# D100-00-00-B027

Ardmore St Bridge Community Engagement Meetings

Ardmore St Bridge Reconstruction Project – June 5th, 2019

The Harris County Flood Control District hosted a public meeting to provide information on the Ardmore St Bridge Reconstruction project on June 5th, 2019.

Presentation

Summary

FAQs

Traffic Study

Meeting Video