
Buffalo Speedway
What is being done to the Buffalo Speedway Bridge?
The current bridge will be demolished and replaced with a higher, longer, and wider bridge. This will increase the capacity of the channel, allowing for more flood waters to flow throughout Brays Bayou. The new bridge will be four lanes wide, include a left turn lane at each intersection, and have an expanded 10-foot sidewalk.