About Buffalo Speedway Bridge

Project Brays Segment 3 Map

Buffalo Speedway

What is being done to the Buffalo Speedway Bridge?

The current bridge will be demolished and replaced with a higher, longer, and wider bridge. This will increase the capacity of the channel, allowing for more flood waters to flow throughout Brays Bayou. The new bridge will be four lanes wide, include a left turn lane at each intersection, and have an expanded 10-foot sidewalk.

Project ID# D100-00-00-B026

Buffalo Speedway Public Meeting

The Harris County Flood Control District hosted a public meeting to provide information on the Buffalo Speedway Bridge Reconstruction project on July 10th, 2019.

Presentation

Summary

FAQs

Meeting Video