Our Approach Channelk Modifications

Channel Modifications

Approximately 21 miles of the channel has been modified to increase the amount of stormwater the bayou can carry. Beginning at the mouth of Brays, the channel has been widened and deepened 18 miles west to Fondren Road. An additional six miles of the channel was widened and deepened, beginning at Old Westheimer Road and continuing upstream to Highway 6.

Our Approach Bridge Modifications

Bridge Modifications

Modifications will be made to 32 bridges along Brays Bayou to allow for the increased flow capacity.

Our Approach Stormwater Detention Basins

Stormwater Detention Basins

Four stormwater detention basins have been created to hold approximately 3.5 billion gallons of stormwater and cover about 900 acres. A stormwater detention basin is an area where excess stormwater is stored until the water level in the channel recedes, allowing the stormwater to flow away safely.