About South Rice Ave Bridge

Project Brays Segment 4 Map

South Rice

What is being done to the South Rice Ave Bridge?

The current bridges will be demolished and replaced with higher, longer, and wider bridges. This will increase the channel's capacity, allowing for more flood waters to flow throughout Brays Bayou. The plan is for segments of the bridges to remain open to commuter and pedestrian traffic during the construction period, with temporary lane closures to the North and Southbound lanes as the bridges are being reconstructed.  Construction will begin winter 2020/2021 and is scheduled to last approximately one year.

Project ID#D100-00-00-B030